homeprograms and projectsludbalm
newsshopmissioncreditcontact

Alaska Pipeline Terminus


Name: Alaska Pipeline Terminus
Category: Industrial
Archive ID#: AK3139
 
Description: The Trans-Alaskan Pipeline was completed in 1977 at a cost of $8 billion. It is 48" in diameter and 800 miles long, connecting the oil fields of Prudhoe Bay and the surrounding North Slope, to the port at Valdez. The capacity of the pipe is around two million barrels per day. With an estimated 10 billion barrels of crude (though 80% has now been extracted), the oilfields of Prudhoe Bay are the largest in North America.
Location: 110 miles E of Anchorage, in Valdez
(POINT(-146.34861946106 61.130018310273))
(show on map)
Address: AK
Valdez-Cordova County
Visitor Info: The Dalton Highway roughly parallels the pipeline from Fairbanks to Prudhoe Bay, and is passable for ordinary cars during the summer.
Links: http://www.alyeska-pipe.com/Pipelinefacts/Valdez.html
LCS: Industrial
tag: Petrochmemical Pipeline
   
  map | search